Your Shortlist

Living Areas

Dining 3800 x 2400
Kitchen 3300 x 3000
Living 4000 x 5200
Lounge 4200 x 4400

Bedrooms

Master Bedroom 4000 x 3600
Bedroom 2 3300 x 3100
Bedroom 3 3100 x 3400
Bedroom 4 3400 x 3200
Bedroom 5 3000 x 3100

Total Areas

Floor Area 224m²
Garage Area 36m²

Ranfurly 260

The Ranfurly 260 is for the larger family.

This extensive family home comes with four generous bedrooms and a study (the guest bedroom comes with its own en-suite). The Master bedroom en-suite features a walk-in tiled shower.

The flow between the living areas makes sense (family room, dining room, and lounge).  Adjoining these living areas are the large kitchen and scullery. The Ranfurly also boasts a separate games room and bar.

Download Brochure   Add To Shortlist

Email Us

The RPS Process

Briefing

Design

Estimates

Review

Build

Move In!

Clarity is what we need

Before a single sketch is done, we’ll spend ample time seeking to understand how you want to functionally live in your home. We also need to understand your values, what you and your family regard as important. Only then can we begin designing for you.

Concept visuals that fit

This is where we take your clear ideas and values and start visualising them. What might your ideal house look like?  We’ll look over RPS Home’s 24 existing plans to find a design that suits. We might then modify one.  Or, we’ll work up something bespoke that fits your unique needs.

Creating a preliminary budget

Now we’ll put together an estimate to ensure we meet your budget. The estimate will be based on your preliminary drawings and specifications based on your wish list. We’ll give you time to review your estimate before our next meeting.

Are we on the right track?

Here we sit down with you and review the estimate, preliminary drawings, floor plans, specifications, and soil reports.  If we can tick all the boxes, we all agree to take the next step. RPS Homes will prepare then issue the contract documents to you to review and sign.

Your new home is created

It takes 6 weeks to gain building consent with the local Council. As soon as we have it, construction of your new home will begin. The build takes 18-20 weeks. During that time you’ll receive updated construction schedules detailing the stages of your house build.

Enjoy your brand new home

All the dreaming and planning has now reached its consummation. Your home is finished and you can spend your first night “at home.” And when you turn off the lights, you can sleep easy knowing that your new home has been built properly, with a 10 Year Master Builders Guarantee.